Search
Add Listing
  • You have no bookmark.

Your Wishlist : 0 listings

Sign In

GPS tracking and fuel monitoring solution.

Now Open
  • Viewed - 86

GPS tracking and fuel monitoring solution.

Now Open
  • Viewed - 86

Description

AMAGA PLC is a well-established private limited company in Ethiopia with over 25  years of experience across manufacturing, trading, and distribution sectors. This proposal is submitted in response to AMAGA PLC’s RFQ for a GPS tracking and fuel monitoring solution.

This summary organizes the proposal submitted by AMAGA PLC for a Vehicle GPS Tracking and Fuel Monitoring Solution. This solution is designed to enhance fleet efficiency and prevent resource leakage.


🚛 AMAGA PLC: GPS & Fuel Monitoring Proposal

Reference: AMAGA/RFQ/GPS&FUEL/2025/001

Target: Efficient Fleet Management and Asset Security.

📋 Scope of Services

AMAGA PLC offers a comprehensive package to monitor and manage vehicles through hardware and software integration:

  • Hardware: Installation of GPS tracking units and optional high-precision fuel sensors.

  • Platform: Access to a web-based and mobile fleet management dashboard.

  • Operations: Real-time tracking, automated alerts, and detailed activity reports.

  • Support: Full user training and continuous technical assistance.


🛠️ Key Technical Features

  • Live Tracking & Geo-fencing: Real-time location monitoring and virtual boundary alerts.

  • Fuel Management: Monitoring consumption patterns and identifying fraud (fuel siphoning).

  • Driver Behavior: Insights into speeding, harsh braking, and idling time.

  • Analytics: A data-driven dashboard for long-term operational planning.


🛡️ Hosting, Security & Compliance

  • Data Security: Hosted on secure cloud servers with full encryption and role-based access.

  • Regulation: Fully compliant with Ethiopian ICT regulations.

  • Reliability: Regular data backups and hardware warranties included.


⏱️ Project Timeline

The implementation is structured to be completed within 3–4 weeks:

  1. Phase 1: Planning and Site Survey.

  2. Phase 2: Hardware Installation.

  3. Phase 3: System Testing and Optimization.

  4. Phase 4: User Training and Handover.


📅 Submission & Contact Information

  • Submission Deadline: December 27, 2025

  • Method: PDF via email or in person to Chewe Brenda (Head Office).

Primary Contact:

 

Listing Locations

0
Close

Your cart

No products in the cart.