 Lidiya Memorial Construction PLC invites sealed bids from eligible GC-5 or BC-5 and above contractors for the Construction of Structural work from Semi Basment Vertical structure to 9th floor horizontal Structure of 3B+SB+G+16 Building Project which can be completed within 420 calender days.

🏗️ Lidiya Memorial Construction PLC: Construction Bid

 

 

⚙️ Project Scope Detail

 

The project involves a construction scope where the Structural System features a post-tensioned (PT) slab.

  • Note: All post-tensioning works (design, supply, stressing, anchorage) are excluded from the Contractor’s scope. This work will be fully handled by the Client or an appointed specialist.

 

✅ Bidder Eligibility Requirements

 

Bidders must present copies of the following valid documents:

  • Renewed Trade License for the year 2018 E.C.
  • Renewed Competency Certificate of registration of category GC-5 / BC-5 and Above from an authorized body.
  • Tax Clearance Certificate (valid at least at the submission deadline).
  • VAT Registration Certificate.
  • Tax Identification Number (TIN).
  • Registration of FPPA (Federal Public Procurement Agency) as a Supplier.

 

💰 Financial & Submission Requirements

 

Requirement Detail
Bid Security ETB 650,000.00 (Unconditional Bank Guarantee or C.P.O)
Bid Security Validity Must be valid for 120 calendar days from the bid opening date.
Bidding Document Fee ETB 800.00 (Non-refundable)

 

Document Preparation Notes:

 

  • Technical Proposal: Submit one original and two copies (3 total), signed, stamped, and wax-sealed. It must not include any financial information and must have sequential page numbering (failure to do so results in a 5-point deduction).
  • Financial Proposal: Submit one original and two copies (3 total), signed, stamped, and wax-sealed, and clearly labeled.
  • Final Packaging: All documents (technical, financial, bid security) must be enclosed in one large outer envelope.

 

📅 Key Dates and Location

 

Action Schedule/Date Location
Document Purchase Starts from the first publication in the Ethiopian Reporter newspaper. Lidiya Memorial Construction PLC Office, Mayswi Building, 2nd floor, Wengelawit to Gorgoriyos Road, Addis Ababa.
Bid Submission Deadline Within 21 calendar days of the announcement by 4:00 AM local time. (Extended to the next working day if the deadline falls on a holiday). Same as Document Purchase Location (Hand-delivery only).
Bid Opening Same day as the deadline at 4:30 PM local time. Company meeting hall (implied, at the Head Office).

 

📞 Contact:

 

  • Contact Number: 0912966089

 