Here is the organized summary of the Invitation for Bid from DMC Construction PLC for specialized subcontracting work on the DMC Real Estate MIXED USE APARTMENT BUILDING (BLOCK A1: 3B+G+26).
🏗️ DMC Construction PLC: Subcontractor Invitation for Bidding (NCB)
📌 Project and Scope Details
| Project Name |
Location |
Project Scale |
Required Subcontractor Grade |
| DMC Real Estate Mixed Use Apartment Building, Block A1 |
Addis Ababa, Nifas Silk Lafto Sub-city (around Lebu Mebratile) |
3 Basements + Ground + 26 Floors |
Construction Grade V and above |
The subcontract work involves Labor Costs Only; DMC Construction PLC will supply all required materials.
| Subcontract Work |
Scope Description |
Subcontractor Responsibility (Tools/Equipment) |
| 1. Rebar Works |
Cutting, Bending, and Fixing of rebars. |
The Contractor (DMC) provides the Cutting and Bending Machine. The Subcontractor handles rebar transportation to the designated site location. |
| 2. Formworks |
Placing and Dismantling of the forms after curing. |
The Subcontractor provides hand tools and handles form transportation to the designated site location. |
| 3. Concrete Works |
Placing and pouring of concrete. |
The Subcontractor provides hand tools and handles concrete transporting/pouring to the designated site location. |
📅 Key Dates and Deadlines (2025)
| Action |
Date |
Time (EAT) |
| Bid Submission Deadline |
November 29 |
2:30 P.M. |
| Financial Bid Opening Date |
November 29 |
3:00 P.M. |
Note: Late bids will be rejected.
🏢 Document Submission and Information
-
Address (Head Office): DMC Construction Plc., Lebu Mebrathaile Roundabout, Nifas Silik Lafto Sub-city.
-
Submission Office: Head Office, 10th Floor.
-
Information Office: Head Office, Engineering Department, 2nd floor.
-
Working Hours for Inquiry: Mondays to Saturdays, 8:00 AM to 12:00 PM and 2:00 PM to 6:00 PM (EAT).
-
Tel: 0974096900, 0975067100
📜 Mandatory Eligibility Criteria
Interested bidders must submit the following evidence:
-
Trading License renewed for 2017 E.C.
-
Tax Clearance Certificate (valid at least up to 28 days after bid submission date).
-
VAT and TIN Registration Certificates.
-
Certificate of Registration from the Ministry of Works and Urban Development with Construction Grade V and above.
-
Documentation of General and Specific Experiences.
-
Documentation of Current Contract Commitments.
📦 Bid Submission Guidelines
-
Envelope Structure: Bidders shall submit two envelopes sealed within an outer envelope:
-
“Technical Application” (in one envelope)
-
“Financial Bid” (in the other envelope)
-
Copies: One original and one copy of the bids must be submitted.
-
Evaluation: The evaluation will be conducted in a single stage. Both the Financial Bids and the initial Technical Qualification Applications will be opened on the bid opening date, followed by a detailed evaluation.
📝 Financial Proposal Template (Quantities for Labor Cost Calculation)
| No. |
Description |
Unit |
Quantity |
| 1 |
Rebar |
KG |
1,666,912.79 |
| 2 |
Formwork |
M$^{2}$ |
30,935.29 |
| 3 |
Concrete |
M$^{3}$ |
7,908.60 |
DMC Construction Plc. reserves the right to accept or reject any or all bids.